NVIDIA has confirmed that its next-gen Rubin chips are already in fab & aim volume production in 2H 2026, while the gaming side posts record revenue.

NVIDIA's Next Chapter In AI Is Already In Fabs, Rubin Ready For Volume Production In 2H 2026

During the Q2 2026 earnings call , NVIDIA CEO Jensen Huang confirmed that their next-gen AI platform, which comprises the Rubin GPU along with 5 other chips , the Vera CPU, CX9 SuperNIC, Spectrum-X, scale Silicon Photonics processor, and NVLINK 144 switch, is already in the fabs and will be available in 2026 as part of the annual cadence. The company also confirmed that the chips will be ready for volume ramp by the 2nd half of 2026.

Jensen states that the Rubin platform will be NVIDIA's 3rd Gen NVLink rack-scale AI supercomputer with a fully ma

See Full Page