Work begins on the demolition of a part of the East Wing of the White House, Monday, Oct. 20, 2025, in Washington, before construction of a new ballroom. (AP Photo/Evan Vucci)
WASHINGTON (AP) — The White House on Monday started tearing down part of the East Wing, the traditional base of operations for the first lady, to build President Donald Trump’s $250 million ballroom despite lacking approval for construction from the federal agency that oversees such projects.
Dramatic photos of the demolition work showed construction equipment tearing into the East Wing façade and windows and other building parts in tatters on the ground. Some reporters watched from a park near the Treasury Department, which is next to the East Wing.
Trump announced the start of construction in a social media post