WAWANESA — The new Wawanesa dam design was announced this month, along with a construction timeline that will see the previous 1939-built dam destroyed in the next three years.
Engineers from the Province of Manitoba and a private company, KGS Group, were in Wawanesa for a council meeting and open house meeting last week to inform residents. The province announced that it has chosen the design to be a new concrete structure downstream from the existing dam, and said the bulk of construction is expected to take place in the fall of 2027.
The news comes as a milestone for the community of Wawanesa, which has been on the radar for a dam repair with discussions going back to 2018, Municipality of Oakland-Wawanesa head of council Dave Kreklewich said.
“For me, it’s peace of mind knowing that

Brandon Sun

The Babylon Bee
New York Post
Newsmax TV
The Daily Beast
OK Magazine
Raw Story
The List
ESPN NFL Headlines
The Conversation