Union Minister for Railways Ashwini Vaishnaw and Japan’s Minister of Land, Infrastructure, Transport and Tourism Hiromasa Nakano on Friday jointly reviewed the progress of the Mumbai–Ahmedabad High-Speed Rail (MAHSR) Project, India’s first bullet train corridor, being developed at an estimated cost of Rs 1.08 trillion. Minister Nakano was welcomed with a traditional Garba reception at Surat International Airport, where MP Mukesh Dalal, Mayor Daxesh Mavani, senior railway officials, and representatives from the National High-Speed Rail Corporation Limited (NHSRCL) were present. At Surat, the ministers inspected the track construction base, where they witnessed the laying of the J-slab ballast-less track system on the elevated viaduct. Vaishnaw highlighted the recent installation of the

See Full Page