NHSRCL launches first steel bridge for Bullet Train project in Ahmedabad in just 7 hours October 11, 2025

Ahmedabad: The Mumbai-Ahmedabad Bullet Train project has completed the launching of its 10th steel bridge in Ahmedabad. Spanning 60 meters in length, the bridge was launched over a Western Railway facility (laundry) located adjacent to the railway tracks. With months of meticulous planning and preparation, the bridge launching was completed with precision in just 7 hours. It is the first steel bridge launched in Ahmedabad district for the project, the National High-Speed Rail Corporation Limited (NHSRCL) said in a press release.

For transverse launching of this bridge, it was assembled at a height of 16.5 metres from the ground on temporary trestles and was then side-slewed using two

See Full Page