CHENNAI: The water stagnation woes of residents of East Gopalapuram's 5th, 6th Streets, and 1st Cross Street in Avadi Corporation have multiplied due to the northeast monsoon showers.
The residents face a severe problem of water remaining stagnant even after small showers in the area.
"We have been requesting the Corporation to construct a proper stormwater drain for several years; however, nothing has materialised to date. A stormwater drain line was constructed earlier, but a 300-m section of the line has been left unfinished by the contractors. We have been requesting the completion of infrastructure for a very long time," said Sridhar Kumar, secretary of Gopalapuram Makkal Seva Sangam.
"Despite the drainage connection in place, the sewage water gets mixed with rain and overflows on

DT Next

AlterNet
America News
NBC News NFL
JACOBIN
The News Virginian Politics
Fox 11 Los Angeles Crime
The List
LiveNOW from FOX Politics
KCRG Iowa