Foot overbridge to link Chandlodiya A and B railway stations in Ahmedabad October 31, 2025

Ahmedabad: Passengers travelling between Chandlodiya A and Chandlodiya B railway stations will soon get a major relief as both stations are being connected through a Y-shaped foot overbridge (FOB). Once completed, commuters will have to walk only about 500 meters instead of the existing 2.5 kilometers to move between the two stations.

Construction work on the Y-shaped FOB has already begun. The project aims to ease passenger movement, saving both time and money. The bridge is being built using bolting and welding techniques, featuring a curved shed design. The main span is being fabricated in Jaipur, while another 200-meter span is under preparation in Rajkot.

The total length of the bridge will

See Full Page