Mumbai-Ahmedabad bullet train project, Mumbai-Ahmedabad bullet train route: The National High Speed Rail Corporation Ltd (NHSRCL) is working in full swing for the completion of India’s first bullet train corridor. The 508-km Mumbai –Ahmedabad High-Speed Rail (MAHSR) corridor passes through Gujarat, Maharashtra, and the Union Territory of Dadra & Nagar Haveli.

Mumbai-Ahmedabad bullet train update

The 47-km priority corridor between Surat and Bilimora is currently in an advanced stage of construction. All civil works and laying of track-bed have been fully completed so far. “Built with advanced engineering techniques on par with international standards, the project features 465 km (about 85% of the route) on viaducts, ensuring minimal land disturbance and enhanced safety. AR

See Full Page