KARACHI:

The flow of vehicular traffic has been fully restored on the Korangi Crossing, and partially on the EBM Causeway after water level receded in Malir River on Friday.

Both tracks of the Korangi Crossing, Nadi Road, and one track of the EBM Causeway have been reopened easing pressure on Qayyumabad, Jam Sadiq Bridge and other adjoining area roads.

The EBM Causeway Road has only been reopened for motorcycles and small vehicles, but remains closed for heavy transport vehicles. The causeway has suffered significant damage due to the recent floodwaters, resulting in large potholes disrupting the flow of traffic.

Traffic police are voluntarily filling the potholes by spreading sand and mud. One track of the causeway has been restored after blocking water coming from the Malir River.

M

See Full Page