BATAVIA — A number of buildings have been demolished already on the Harvester Center campus as of Monday, with more to go.
In Batavia City Court, attorney Michael Cole told Judge Durin Rogers that he had been to the Harvester site last Thursday and that buildings 3 and 5, located along the railroad tracks along one side of Harvester, along with buildings 6, 8, 9, 10, 21, the elevator and the skybridge, have been demolished.