Maharashtra: Prime Minister Narendra Modi on Wednesday inaugurated Phase 2B of Mumbai Metro Line-3, stretching from Acharya Atre Chowk to Cuffe Parade. Constructed at a cost of Rs 12,200 crore, this milestone marks a significant step in the transformation of Mumbai’s urban transport system.

Phase 2B Enhances Connectivity Across the City

With the completion of Phase 2B, the entire Rs 37,270 crore Mumbai Metro Line-3 (Aqua Line) has been dedicated to the nation. The expanded metro corridor promises to drastically improve connectivity, reduce travel times, and ease traffic congestion in the densely populated city.

Mumbai Metro Line-3: Key Details and Facts

The entire Aqua Line of Mumbai Metro Line-3, spanning 33.5 km with 27 stations, will now be fully operational, with 26 stations under

See Full Page