Mumbai Metro Aqua Line-3: Prime Minister Narendra Modi has inaugrated the final phase of Mumbai Metro Aqua Line-3, marking a key milestone in easing commuting across the city. The latest Mumbai Metro Line-3 phase, constructed at a cost of over Rs 12,000 crore is set to be a crucial link connecting business hubs, entertainment zones and the airport. Here are the top facts about the project: Operations at the newly constructed metro line will commence from October 9, 2025. Key interchanges along the route will integrate the metro with the existing transport network, including stops at Mumbai Central, CSMT Metro and Churchgate for the suburban railways and Marol Naka for Metro Line 1. The line also offers direct connectivity to the Domestic (T1) and International (T2) Airports. Mo
Mumbai Metro Aqua Line-3: Big connectivity boost for Mumbaikers! Check stations, route, timings & travel time

79