SPOKANE, Wash. – Avista has announced that traffic will be impacted on several streets Friday, as preparations for the assembly of the crane that will be used for rock relocation work at the Monroe Street Dam are completed.

From 4:30 a.m. to 7 p.m., Spokane Falls Boulevard will be closed between Post Street and Lincoln Street. All street parking will be closed on this stretch of the boulevard as well.

Between Stevens Street and Post Street, Spokane Falls Boulevard will be reduced to two lanes, however, drivers will still be able to turn north on Post Street, and access will remain available for street parking and crossing the Post Street Bridge. Access to the entrance and exit of River Park Square’s parking garage will also remain available. Through traffic will be detoured south at Howa

See Full Page