• Hover Street bridge rehab construction: Two lanes will be closed on Hover Street, with one lane open in each direction. Southbound Hover to eastbound Third Avenue left turn prohibited and signed detour to turn east onto Boston Avenue and north onto Sunset Street will be in place. Work will occur from 7 a.m.-5:30 p.m. with an expected completion date of Dec. 22.
• Sugarloaf Road culvert replacement at Betasso Road: Two culvert replacements on Sugarloaf Road at Betasso Road will require lane closures and the installation of a temporary three-way traffic signal, which will result in travel delays. Work is anticipated to last into November. Access to Betasso Preserve will be maintained.
• City of Boulder 63rd Street waterline replacement: The city of Boulder is conducting a waterline repla