YOUNGSTOWN - Over 300 FirstEnergy customers are without power after a utility pole in Pleasant Grove was struck by a car Saturday morning.

The call came in shortly before 9 a.m., reporting that power lines were down and that responders were looking for a silver Chevy Blazer that was involved in the accident at the intersection of Maywood Drive and Erie Street.

When first responders arrived on scene, they found that the power lines were still suspended and posed no public safety risk, but that power was still out.

FirstEnergy dispatched a crew to investigate and repair the lines. According to the FirstEnergy Outage map, power is expected to be restored by 11:00 a.m. on Saturday.

See Full Page