WAIMANALO (HawaiiNewsNow) - The City and County of Honolulu’s Department of Design and Construction will soon begin reconstruction of the Waimanalo Beach Park Pavilion.
The new pavilion will reflect the original design. It will match the size and architectural character of the structure that was built in 1960 and demolished in 2019 due to structural concerns.
The new pavilion will consist of concrete structural supports, concrete block walls, and an asphalt shingle roof with stainless steel gutters and downspouts. Built-in concrete benches will provide seating within the pavilion.
Starting Oct. 14, crews will be working Monday through Friday from 7:00 a.m. to 3:30 p.m., excluding holidays.
Completion is expected at the beginning of summer 2026.
The design contract, valued at $330,