COVINGTON, Ky. —
One lane will be closed for two weeks on the Clay Wade Bailey Bridge as crews perform corrective work from a recent bridge repair project.
The single lane closure will begin on Monday, Nov. 3 and is expected to be cleared by Nov. 17. The lane closure will be in effect 24/7. Advertisement
The lane closure will be in place on U.S. 25 from Fourth Street in Covington to W. Second Street in Cincinnati.
Work on the bridge includes bridge overlay and pier work, according to the Kentucky Transportation Cabinet.
People will still be able to use the pedestrian path on the Clay Wade Bailey Bridge, though they may encounter brief periods when they will be asked to stop due to moving equipment.

 WLWT
 WLWT

 LiveNOW from FOX Crime
 LiveNOW from FOX Crime CBS19 News Crime
 CBS19 News Crime KOLD Tucson
 KOLD Tucson First Alert 4 Crime
 First Alert 4 Crime KWQC
 KWQC WGEM News
 WGEM News News 9 Crime
 News 9 Crime The Newnan Times-Herald
 The Newnan Times-Herald Detroit Free Press
 Detroit Free Press 5 On Your Side Sports
 5 On Your Side Sports